Construction of a Crude Oil Pipeline & 4 Units of Pumping Stations
Client: NIOC, Engineering & Construction Affairs
Scope Of Work:
- Construction of a 56" × over 1,000 KM Crude oil substitute pipeline at the Persian Gulf Coastline from Gurreh in the southern oil field to Jask off the strait of Hormoz.
- Construction of 4 Pumping Stations each with the maximum capacity of 61,000 horsepower and 2,000,000 barrels per stream day, and the maximum stream pressure of 1,200 Pound/square inch.
- Scope of Services of the Consultant: Providing the Preliminary & Detail Engineering Services.
Start-Finish: 1990-1993