Client: N.I.O.E.C. Engineering and Construction Company
Scope of Work: Execution of the continuation of the 10 inch pipeline branch from the Tabriz-Urumieh Pipeline in between Salmas/Khoy with an approximate Length of 24 Kms. And the execution of fibre optics for the 14 inch Tabriz-Urumieh petroleum products pipeline approximately 222 Kms. Long and the 10 inch branch off in between Salmas/Khoy with an approximate length of 34 Kms. i.e. 256 Kms. In total complete with installation of an intelligent leakage detection system. Furthermore, completion of the respective related works which include corrective measures in Electrical Pumping Station in Tabriz and Urumieh Terminal and execution all the required complementary works and installations needed in between the pipeline route of Salmas Pumping Station and Khoy Terminal also execution of installation of two complete telecommunication stations in Ghareh Tapeh and Kuzeh Kanan.
Start-Finish: 2020- Under execution